Skip to content
Dx

ICD-10-PCS 2027 procedure code

XW033R9Introduction of Rezafungin into Peripheral Vein, Percutaneous Approach, New Technology Group 9

✓ Valid for 2027

Short description: Introduce Rezafungin in Periph Vein, Perc, New Tech 9

Code last changed in FY2024 (effective October 1, 2023). Source: official FY2027 ICD-10-PCS release from CMS. Page updated September 29, 2026. About our data

About XW033R9

XW033R9 is the ICD-10-PCS code for a introduction procedure on the peripheral vein using a percutaneous approach with rezafungin (qualifier: new technology group 9). In ICD-10-PCS, introduction means putting in or on a therapeutic, diagnostic, nutritional, physiological, or prophylactic substance except blood or blood products.

For a different body part, codes include XW043R9 (central vein).

With a different device, use XW033K9 (paclitaxel-coated balloon technology, three balloons), XW033P9 (gentamicin-eluting bone void filler) and XW033Q9 (iloprost).

It doesn't appear in the MS-DRG procedure index, so on its own it doesn't change the DRG assignment.

It was added in FY2024, effective October 1, 2023.

What each character means

1. Section
XNew Technology
2. Body System
WAnatomical Regions
3. Operation
0Introduction

Putting in or on a therapeutic, diagnostic, nutritional, physiological, or prophylactic substance except blood or blood products

4. Body Part
3Peripheral Vein
5. Approach
3Percutaneous

Entry, by puncture or minor incision, of instrumentation through the skin or mucous membrane and any other body layers necessary to reach the site of the procedure

6. Device / Substance / Technology
RRezafungin
7. Qualifier
9New Technology Group 9

Other versions of this procedure

Code history

  1. 2016
  2. 2017
  3. 2018
  4. 2019
  5. 2020
  6. 2021
  7. 2022
  8. 2023
  9. 2024
  10. 2025
  11. 2026
  12. 2027
  • FY2024 (effective 10/1/2023): Added
  • No changes since FY2024.

Common questions about XW033R9

Is XW033R9 a valid ICD-10-PCS code for 2027?

Yes. XW033R9 is valid for inpatient procedures from October 1, 2026 through September 30, 2027.